DFSS has the technical and engineering capability to provide the solution you need. We will consult, design and install a system that is best suited for your buildings needs and you.
Digital Fire was contracted by Johnson Controls for the new construction of the Place Bell in Laval, Quebec. Digital Fire assisted with the system design and technical support of the large Johnson Control - IFC Network which contains five (5) DGP's. Construction started in late 2014 and was completed in 2017.
Digital Fire was contracted by Chubb Edwards for the new construction of the Met Condos in Vaughan, Ontario, Canada. Digital Fire installed the control equipment and programming of the Edwards Network - 9 DGP's, as well as performed the verification on the fire alarm system. This project was completed in 2020.
Digital Fire was contracted by Chubb Edwards for the new construction of the Stanley Condos in Toronto, Ontario, Canada. Digital Fire installed the control equipment and programming of the large Edwards Network - 7 DGP's and performed the verifcation of the fire alarm system. This project was completed in 2020.
Digital Fire was contracted by Chubb Edwards for the new construction of a student residence project - HOEM on Jarvis in Toronto, Ontario, Canada. Digital Fire installed the control equipment of a large Chubb Edwards Network - 7 DGP's as well as installed the programming on the fire alarm system. This project was completed in 2016.
Digital Fire was contracted by Chubb Edwards for the new construction of 1000+ apartments and commercial complex - Hullmark Centre in Toronto, Ontario, Canada. Digital Fire installed the control equipment and programming of the large Edwards network - 20 DGP's, 5 CACF -as well as performed the verification of the fire alarm system. This project was completed in 2016.
Digital Fire was contracted by Durham Central Fire Systems for the new construction of two high rise condo towers and commercial complex - Studio Condos in Toronto, Ontario, Canda. Digital Fire installed the control equipment of the large Edwards network - 7 DGP's and 2 CACF's, installed the programming and performed the verification on the fire alarm system. This project was completed in 2016.
Digital Fire was subcontracted by Durham Central Fire Systems for the new construction of a 1200 apartment complex - Maple Leaf Square in Toronto, Ontario, Canada. This complex consisted of two high rise condo towers, offices, hotel and a commercial complex. Digital Fire installed the programming and performed the verification on a large Edwards network - 40 DGP's and 2 CACF's. This project was completed in 2010.
Digital Fire performed a full system retrofit on behalf of Vipond Systems Inc. It was a large Notifier Network - 7 DGP's, 2 CACF's and graphic computers. Digital Fire designed the fire alarm system, installed the control equipment and programming of this system and conducted the verification of the fire alarm system. This project was completed in 2013.
Digital Fire was under contract by Vipond Systems Inc to perform a full system retrofit of the fire alarm panel at 438 University Avenue in Toronto, Ontario, Canada. This was a large notifier network that has 6 DGP's and graphic computers. Digital Fire designed the fire alarm system, installed the control equipment and programming, and performed the verification of the fire alarm system. This project was completed in 2019.
Digital Fire was subcontracted by Vipond Inc to complete a full system retrofit of the fire alarm system at 720 Bay Street in Toronto, Ontario, Canada. Digital Fire designed the fire alarm system, installed the control equipment and programming as as well as performed the verification of this Notifier Network - 5 DGP's, and Graphic Computers. This project was completed in 2018.