DFSS has the technical and engineering capability to provide the solution you need. We will consult, design and install a system that is best suited for your buildings needs and you.
Digital Fire was subcontracted by Durham Central Fire Systems for the new construction of Hotel X in downtown Toronto, Ontario. Digital Fire installed the control equipment and programming, and conducted the verification of the large Edwards Network - 12 Data Gathering Panel's (DGP's). This project was completed in 2018.
Digital Fire was the General Contractor on this project at the Courtyard by Marriott at 475 Yonge Street in Toronto, Ontario. Digital Fire performed a retrofit installation replacing a fully addressable EST2 Fire Alarm Panel to a Notifier with 3 nodes. Digital Fire designed the fire alarm system, installed the programming and verified the fire alarm. This project was completed in 2015.