Digital Fire & Security Services INC.
Projects
DFSS has the technical and engineering capability to provide the solution you need. We will consult, design and install a system that is best suited for your buildings needs and you.
Digital Fire was subcontracted by Johnson Controls for the new construction of a 1.8 million square foot healthcare facility, Peel Memorial Health Centre in Brampton, Ontario, Canada. Digital Fire designed the fire alarm system, installed the control equipment as well as the programing and verification. This system has 4 DGP's, 2 CACF's and a graphic computer. This project was completed in 2016.
Digital Fire was subcontracted by JCI for a new 1.8 million square feet new construction healthcare facility - Humber River Regional Hospital in Toronto, Ontario, Canada. Digital Fire designed the fire alarm system, installed the control equipment and programming, and conducted the fire alarm verification. This project involved a large JCI Controls Network - 10+ transponders, 2 CACF's and graphic computers. This project was completed in 2015.
Digital Fire was subcontracted by JCI for the new construction of a five hundred thousand square feet health care facility - Bridgepoint Health System in Toronto, Ontario, Canada. Digital Fire designed the fire alarm system, performed the programming and fire alarm verification of a large Johnson Controls Network - 8+ transponders, 1 CACF, Grahic Computers. This project was completed in 2013.
Digital Fire was contracted by Vipond Inc for the new construction of three new buildings as part of Phase 1B at CAMH in Toronto, Ontario. Digital Fire integrated the Notifier Network with the exisitng system - over 40 nodes. Digital Fire also programed the fire alarm system. This project was completed in 2012.
Digital Fire was contracted by Johnson Controls to create the system design of the new construction of the two million square feet healthcare facilty at the McGill University Health Care Centre in Montreal, Quebec. Digital Fire designed the fire alarm system and conducted the high level programming of the large JCI network - over 10 transponders, 2 CACF's and graphic computers. This project was completed in 2014.
Digital Fire was contracted by JCI for the new construction of the one (1) million square feet healthcare facility in St. Catherine's, Ontario - Niagara Health. Digital Fire designed the fire alarm system, installed the control equipment, conducted the set up and programming and verified the fire alarm system of more than 15 transponders, two (2) CACF's and graphic computers. This project was completed in 2019.